Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 705 decisions within 5 km, 1 exact-site or onsite candidate record, and 53 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
53 structured nearby appeal records.
53 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 2 no. new themed junior attractions consisting of a 'Crazy Bus Ride' with a maximum height of 7m Above Ground Level and a 'Samba Balloon Ride' with a maximum operating height of 5.2m Above Ground Level. 1 no. Operations Room (2.89 sqm Gross Floor Area (GFA) is also provided, associated and ancillary to the 'Samba Balloon Ride'. The proposed development also incorporates amendments to existing internal paths and connections within Tayto Park, boundary treatments and infrastructure, together with all associated and ancillary development works on a combined site area of 0.0287ha
Permission for retention is sought for a themed train ride attraction comprising: an at grade train track of 396 m in length; a timber clad tunnel and maintenance structure associated with the train ride attraction, and for the inspection repair and servicing of Tayto Park attraction (Gross Internal Floor Area 161.5 sqm, and 3.85m in height); a railway station façade structure of 4.9 m in height and 23.7 m in length; amendments to existing internal paths and connections within Tayto Park; and all associated landscaping, boundary treatment, development and works, on an overall site of 0.393 ha. The structures are located adjoining the 'Eagle's Nest' area of Tayto Park, and to the south of Kilbrew Graveyard
Retention permission for the existing use as dry goods storage and distribution for goods not associated with the adjoining Largo Foods Facility (Ref. Condition 6 of Permission DA121067), together with permission for proposed upgrades to the established vehicular access. The proposed development will include all ancillary drainage, services, landscaping, public lighting, road signage and all site development works associated with the proposed development
Retention of the existing use as dry goods and distribution for goods not associated with the adjoining Largo Foods Facility (Ref. Condition 6 of Permission DA1211067), together with established vehicular access and all associated site development works
Planning permission for the retention of a) 2no. new extract flues to the roof of existing factory building, b) a storage compound with low level walls, security fence and security barriers all to the rear of the site and c) all associated site works. Significant further information/revised plans submitted on this application
A 173 sq.m. two-storey extension to front of existing warehouse and all associated site development works
The brief summarizes the pattern across all 705 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212407The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief