Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 514 decisions within 5 km, 2 exact-site or onsite candidate records, and 28 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
28 structured nearby appeal records.
28 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Is sought as follows: (a) Partial demolition / alteration / extension and refurbishment of existing derelict dwelling house. (b) RETENTION of roof remedial works carried out on the existing ancillary outbuildings. (c) 'Change of Use' of existing rear outbuilding to study / remote home office. (d) Adjust existing vehicular entrance. (e) Install wastewater effluent treatment system (f) all ancillary site works and services
To construct a dwelling house and garage, with effluent treatment system, and all associated site works
Of extension consisting of porch at front of dwelling house
The development consists of the filling of lands with imported inert waste material consisting of soil and stone for improved agricultural purposes and all associated ancillary works
For modifications to the existing dwelling which include the removal of the existing rear extension, the construction of a new single storey extension to the rear of the existing dwelling, the construction of a new two storey extension to the side of the existing dwelling, a single storey car port to the side of the proposed two storey extension and associated site works
To install flood lighting consisting of 8 No. 18m lighting poles to serve the existing playing field and all associated site works
The brief summarizes the pattern across all 514 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221050The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief