Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 246 decisions within 5 km, 1 exact-site or onsite candidate record, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of (i) 72 no. self-catering units in 3 no. three storey buildings (total gross floor area: c.8,575 sqm) comprising 54 no. 2 bedroom units (84sqm each) and 18 no. 3 bedroom units (98sqm each), (ii) a single storey multi-use recreational and amenity pavilion building (120sqm); (iii) 79 no. surface level car parking spaces and additional internal access roadway, (iv); the relocation of existing playground, (v) The re re-alignment of c.70m length of existing foul and surface water drainage, landscaping, 2 no. bicycles and bin stores (one including plant, switch room and substation; the second includes a store), and ancillary site development works including 2 no. underground attenuation tanks, SUDs features such as permeable paving, integrated tree pits and rain gardens, the omission of 14 no. existing car parking spaces) all on a c.1.92ha. site within the curtilage of Ballina (Ballyna) House, a protected structure at Moyvalley Hotel & Golf Resort, Balyna Estate, Moyvalley, Co Kildare. The proposed development will connect to existing engineering services and on-site utilities, access roads, hotel amenities, etc at Moyvalley Hotel & Golf Resort. An environmental impact assessment report and a natural impact statement have been prepared in respect of the proposed development
The construction of a single storey side (west) and rear (south) extension to accommodate a master en-suite bedroom and an extended kitchen/dining/living space, plus all associated site works
For decommission and removal of existing wastewater treatment system and ancillary systems and the construction of a new on-site wastewater treatment systems and polishing filter/percolation area
To erect new agricultural storage shed
For single storey extension to house, also retention of racing pigeon loft, also retention of timber fencing at side of house. Revised by Significant Further Information which consists of upgrade of waste water treatment system
For the construction of a new detached two storey dwelling incl. an attached “Granny Flat” along with a single storey detached domestic Garage/Stables ancillary to the use of the dwelling, together with utilizing the existing agricultural entrance as a shared Agri/Domestic entrance from the public road, installation of a new proprietary waste water treatment system together with all associated landscaping, site works and services
The brief summarizes the pattern across all 246 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221498The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief