Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 993 decisions within 5 km, 3 exact-site or onsite candidate records, and 68 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
68 structured nearby appeal records.
68 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A proposed domestic garage to the rear of existing dwellinghouse and all ancillaries
The development will consist of the construction of a single-story extension to the side of existing dwelling, incorporating a new extended dining area, pantry, mudroom, W/C and home office, and all associated site works and landscaping,
Construction of ground floor single storey extension to the rear of existing dwelling, including all ancillary site works
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE NORTH OF THE EXISTING SCHOOL CONSISTING OF 7 CLASSROOMS, 2 S.E.T ROOMS, ASSOCIATED TOILETS AND ANCILLARY ACCOMMODATION. THE WORKS INCLUDE THE INSTALLATION OF ROOF MOUNTED PV PANELS, (2) ALTERATIONS WITHIN THE EXISTING SCHOOL TO CONVERT AN EXISTING CLASSROOM INTO A STAFF ROOM AND FORM AN INTERNAL LINK TO THE PROPOSED EXTENSION, (3) SMALL SINGLE STOREY EXTENSION TO THE EASTERN SIDE OF EXISTING SCHOOL TO ALLOW A LARGER STAFF ROOM, (4) UPGRADE TO EXISTING TREATMENT PLANT AND REPLACEMENT OF EXISTING PERCOLATION AREA WITH A NEW PERCOLATION AREA RELOCATED TO THE NORTHEAST OF THE SITE, (5) INSTALLATION OF A RAINWATER ATTENUATION TANK, (6) ALTERATIONS TO EXISTING TRAFFIC FLOW AND PARKING WITHIN THE SITE, TO PROVIDE 1 WAY TRAFFIC SYSTEM AND INCREASED NUMBER OF PARKING SPACES AND SET DOWN SPACES. THIS NEW TRAFFIC SYSTEM INCLUDES CONVERTING THE EXISTING VEHICULAR ENTRANCE TO THE SITE INTO AN ‘ENTRANCE ONLY’ AND CREATING A NEW VEHICULAR ‘EXIT ONLY’ FROM THE SITE ONTO THE PUBLIC ROAD AT THE SOUTH WEST OF THE SITE, (7) THE PROVISION OF AN EV (ELECTRIC VEHICLE) CHARGING POINT, (8) THE CONSTRUCTION OF A NEW GAS COMPOUND AT THE SOUTHEAST OF THE SITE, (9) THE INSTALLATION OF PUBLIC STREET LIGHTING ALONG THE ROAD TO THE WEST OF THE SITE, (10) NEW SCHOOL SIGNAGE, (11) THE REMOVAL OF 4 NO. TEMPORARY BUILDINGS FROM THE SITE AT THE COMPLETION OF THE PROJECT, (12) THE RELOCATION OF A CONTAINER FROM THE EXISTING SCHOOL CARPARK TO THE EASTERN BOUNDARY, (13) ALL SITEWORKS ASSOCIATED WITH THE ABOVE.
The development will consist of an extension to and alterations within the existing school as follows: (1) Construction of a single storey extension to the Northwest of the existing school consisting of 7 classrooms, 2 S.E.T. Rooms, associated toilets and ancillary accommodation. The works include the installation of roof mounted PV Panels, (2) Alterations within the existing school to convert an existing classroom into a staff room and form an internal link to the proposed extension, (3) Small single storey extension to the Eastern side of existing school to allow a larger staff room, (4) Upgrade to existing treatment plant and replacement of existing percolation area with a new percolation area relocation to the Northeastern corner of the site, (5) Installation of a rainwater attenuation tank, (6) Alterations to existing traffic flow and parking within the site, to provide 1 way traffic system, bus set down areas and a total of 38 parking spaces. The new traffic system includes converting the existing vehicular entrance to the site into an 'Entrance only' and creating a new vehicular 'Exit Only' from the site onto the public road at the South West of the site, (7)The provision of an EV (Electric Vehicle) charging point, (8) The removal of No. 4 temporary building from the site at the completion of the project, (9) The relocation of a container from the existing school carpark to the Eastern Boundary, (10) All siteworks associated with the above. Significant further information/revised plans submitted on this application
The development will consist of the following: 1. Demolition of existing extension and construction of a new single storey extension to rear of existing dwelling 2. Proposed dormer windows to rear of existing dwelling to accommodate habitable room at first floor. 3. Alterations to existing elevations including alterations to window & door types along with material finishes to dwelling. 4. Conversion and extension of existing garage. 5. Existing septic tank to be decommissioned and new wastewater treatment system and percolation area to be installed. 6. All associated site works
The brief summarizes the pattern across all 993 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221524The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief