Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 1,126 decisions within 5 km, 7 exact-site or onsite candidate records, and 98 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
98 structured nearby appeal records.
98 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of the following (1) to construct a single storied type family flat extension to incorporate a home office and store (2) to construct a connecting flat roof link corridor between existing main dwelling and proposed family (3) to connect to existing public sewer and water mains (4) and all ancillary site development works
The development consists of retention of amendments and alterations to floor plan and elevations including retention of (1) 2 storey extension constructed to front elevation and single storey extensions to side and rear house elevations (2) domestic garage (3) domestic home office (4) domestic store and all ancillary site works.
To construct a two storey dwelling house, detached garden shed, connection to public sewers and watermain, new entrance onto public road and all associated site development works
To construct (1) two storey dwelling (2) domestic garage (3) connection to existing foul water sewerage and mains water supply (4) all ancillary site works
The development will consist of the following: The removal of post and wire fencing to the front of the site, removal of timber P&R fencing to the rear of the site along with the removal of three existing trees enclosing the site entrance. Permission is also sought for the reduction in the depth of the existing grass verge to accommodate a pedestrian footpath. The development proposes 8. No. dwellings, 4 no. Type A dwellings of 252sqm, and 4 no. Type B dwellings of 234sqm. Provision of 2no. car parking spaces per dwelling including universal access spaces, electric charging points, covered bicycle spaces and bin storage. The development includes an internal hammerhead roadway at 5.5m wide finished in colored asphalt. The development will also include landscaping, SuDS drainage and all ancillary works necessary to facilitate the development. Significant further information/revised plans submitted on this application
Permission to construct a two storey dwelling house, connection to public sewers and watermain and all associated site development works
The brief summarizes the pattern across all 1,126 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221660The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief