Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 452 decisions within 5 km, 4 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The upgrading of the flood lighting to training standard and all associated ancillary and site works to serve the existing football pitch
The development consists of (i) the Demolition of Existing Shed (7m²), (ii) Retention of Existing Timber Garden Shed (18m²), (iii) Permission for the proposed construction of a Two Storey Extension to the side of existing house, (iv) proposed Single Storey Porch Extension to the front, (v) proposed Single Storey Extension to the rear, Total Proposed Extended Area = 48m², (vi) 2 no Proposed Roof-lights and all associated site works
The proposed development consists of the erection of a temporay single-storey one-classroom pre-fab and associated site works on grounds to the front of the exising school building at Dunsany National School
The demolition of the existing water tower, construction of a new single-storey extension to the side and alterations & refurbishment of the existing building to the front of Dunsany National School
The development will consist of widened and amended road access to existing Road entrance, new single storey porch to front door, Extended dormer to south elevation facing road, new Roof lights, and associated ground works
(a) construction of a lunging ring, loading ramp, wash down area and machinery shed (b) erection of solar/pv panels (c) provision of internal staff facilities into one bay of existing barn to be connected to existing 6-8 person wastewater treatment system and polishing filters (d) the provision of all associated site works to upgrade existing farm complex including proposed internal service roads, beech hedging, timber fencing, general paddocks, nursery paddocks, all weather areas with individual horse shelters, external all weather sand arena, cross country area, hunter & pony all weather area, trailer and horse box parking area, vegetable garden and external hen & pig area
The brief summarizes the pattern across all 452 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221712The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief