Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,014 decisions within 5 km, 1 exact-site or onsite candidate record, and 75 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
75 structured nearby appeal records.
75 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) Retention of the existing core storage building (2) Full Planning Permission for the erection of a single storey extension to rear of existing Laboratory and (3) All ancillary site development works
The development consists of 1) Retention of the existing concrete base/floor, 2) Full planning permission for the erection of a single storey portal frame building for electrical transformers, and 3) All ancillary site development works
The development consists of external elevational signage on the unit’s front/south-eastern elevation including changes to elevational treatment and window graphics, external elevational signage on the side/south-western elevation, trolley safety signage at the existing trolley bays, disabled and parent & child parking signage at the existing parking spaces, and all associated site works necessary to facilitate the development
The demolition of the existing of the existing single storey welfare & office facilities attached to the 'Hoist building' and the construction of a replacement single storey welfare and office facilities to the 'Hoist building' and all ancillary site development works
The development consists of 1) Retention of the existing concrete base/floor, 2) Full planning permission for the erection of a single storey 'Core Logging' portal frame building, and 3) All ancillary site development works
A new portacabin structure on a concrete base, connection to existing services, and all ancillary site development works
The brief summarizes the pattern across all 1,014 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221719The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief