Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 253 decisions within 5 km, 5 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Two storey dwelling house to include installation of effluent treatment system, connection to water supply & individual vehicular entrance and all associated site development works
The construction of a two storey dwelling house to include installation of effluent treatment system, connection to water supply & individual vehicular entrance and all associated site development works. Ref. No. of Outline Planning Permission 22/6
The construction of a two storey dwelling house to include installation of effluent treatment system, connection to water supply & individual vehicular entrance and all associated site development works. Outline Planning Permission Ref. No. 22/5
A two storey dwelling house to include installation of effluent treatment system, connection to water supply & individual vehicular entrance and all associated site development works
The construction of a part single storey, part two storey, detached dwelling with associated single storey detached garage including all associated site works, drainage works and associated landscaping
Construction of a two storey dwelling, garage, entrance, wastewater treatment system and percolation area, and ancillary works
The brief summarizes the pattern across all 253 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 226The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief