To construct a calf shed and dungsted together with all associated site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Rathkyle , Castlecomer , Co. Kilkenny
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 222 nearby planning records within 5 km where a location match is available.
- Matched source
- 22795
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
For construction of an extension to existing slatted cubicle shed together with all other associated site works
For the construction of an overground slurry tower and all associated site works
To construct a new dwelling house, septic tank and percolation area and all associated works as a replacement for the existing sub standard dwelling which is to be converted for re use as a barn
To demolish portion of existing house and sheds, to construct single storey additions, the provision of alterations to the existing house, with new ETU, percolation area with all associated site works
To construct new dwelling house, with septic tank, percolation area with all associated site works and permission to carry out works to existing derelict dwelling for use as an ancillary Garage / Store, demolition of all sheds and part of the existing derelict dwelling
The brief summarizes the pattern across all 222 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 22795The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief