Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,424 decisions within 5 km, 2 exact-site or onsite candidate records, and 90 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
90 structured nearby appeal records.
90 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for a 10 year permission on a site of 26.4778 hectares, to include: the provision of infrastructure utilising constructed and part constructed infrastructure carried out under ref.no. 04179, extended by 09803, 14109 and 18407. 14 no. warehouse/logistics/light industrial buildings each with ancillary offices, plant, parking and yards as per site and newspaper notices - the overall gross floor area of the warehouse/logistics/light industrial units is 68,531sqm; 1 no. fuel filling station (Unit 6) with associated retail, restaurant/cafe facilities, signage and car parking and car wash. Internal roads infrastructure; water infrastructure (potable water, surface water (incl. SuDS measures) and foul water. Utilities infrastructure and connections including substations. Provision of a river walk along the Castle town River. Landscaping works, including boundary treatments and cut and fill of the lands to provide for finished ground levels. All associated site development works. Unit 11 is subject of a seperate permission (ref. no. 22/524 refers). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement have been submitted with this application **Significant further information received on 9.6.23**
The development will consist of: (1) Construction of a light industrial / manufacturing facility [c.15,967sq.m GFA / height c.14.57m]. The main facility will include manufacturing and warehousing areas at ground floor, with production offices and storage at first floor / mezzanine-levels. Ancillary uses will consist of research and development (R&D) and office space, a reception / showroom, stair and lift cores, circulation areas, and staff welfare amenities, all extending over two floors in the north and west of the facility. (2) A pedestrian and vehicular access and egress point to the west of the facility and a HGV access and egress point to the south-west of the facility, both connecting to the internal road network of the Dundalk North Business Park. (3) Provision of 200 no. car parking spaces, including 10 no. accessible spaces and 40 no. electric vehicle (EV) charging spaces, and 14 no. motorcycle parking spaces, located to the west of the facility. (4) Provision of 40 no. covered bicycle parking spaces, located to the north (10 no. spaces) and west (30 no. spaces) of the facility. (5) A service / marshalling yard to the east and south of the facility. (6) Provision of out / utility buildings [c.1,329.9sq.m. GFA], shelter structures, external storage, battery storage, plant, a generator, a transformer, sprinkler tank and pump house. (7) An ESB substation and switchroom to the north-west of the facility. (8) A R&D yard to the north of the facility, comprising of varying terrains and slopes, a viewing platform, a machine wash area, a machine compound, and a bio-retention SuDS area. (9) Provision of site lighting, security fencing, and gates. (10) Installation of PV panels at roof level. (11) Erection of building mounted signage on the north, east and west elevations [(c.5m high x c.3m wide) x 3 no. signs] and an illuminated totem sign located at the facilities main entrance [c.2m high x c.1m wide]. (12) The erection of a retaining wall, an acoustic fence, and a berm with screen planting along the eastern boundary, and a berm with screen planting to the north and west of the R&D yard. (13) All hard and soft landscaping works, including the provision of SuDS features, surface treatments, planting, and boundary treatments. (14) All associated site development works, including above and below ground services, on a site of c.6.39ha.
Extension of Duration Parent Ref: 04/179 - 1 (a)(p) 37 hectares (92 acres) of land for a business park,16no. 9m high wholesale warehouse showrooms (6 units @ 1045msq, 6 units @ 1190msq, 1 @ 1310msq & 1 @1845msq, 1 @ 1470msq, 1 @ 1345msq), 1no. 9m high enterprise centre & creche(5875msq), 2no. 9m high office units (1 @5875msq & 1@6430msq), 24no. 9m high incubator office units( all are 265msq), 18no. 9m high lockup units(units 90msq), 37no. 9m high incubator warehouses (25 at 295msq &12 at 400msq), 3no.14m high major warehouses(10205msq,9370msq,9335msq), 1no.14m high High Bay Distribution Ind Unit(at 22210msq), 11no. 14m high medium density ind units(5units at 955msq, 1@1220msq, 1@1350msq,1@1445msq,1@1480msq, 1@1740msq,1@2005msq), const new roundabout on the Armagh Rd to provide access to the proposed business park, assoc. internal roads,parking,siteworks,landscaping &site regrading,1 (b)Outline for the provision of a new wastewater pumping station, electricity substation, petrol filling station & shop
Permission for the construction of 2.4m high security fence, 149.95m long, located in a ca.0.783ha site in the south-east section of the Dundalk North Business Park. Access to the development inside the site will be from the recently constructed internal road network
Permission to demolish single storey extensions to the side and rear of dwelling and for a two storey extension to the back/side of existing dwelling. *Significant further information received 13/01/2020**
Permission to demolish single storey extensions to the side and rear of dwelling and for a two storey extension to the back/side of existing dwelling and waste water treatment system with percolation area
The brief summarizes the pattern across all 1,424 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22976The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief