Executive snapshot
23% of nearby decided applications were refused. The site check found 413 decisions within 5 km, 8 exact-site or onsite candidate records, and 33 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
33 structured nearby appeal records.
33 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention and completion of 3 no. buildings, Unit A: Two no. 3 bed family units, Unit B1: Five no. single bedrooms with dining/living kitchen and shower area also one no. self-catering 3 bed family unit, Unit B2: Five no. single bedrooms with dining/living kitchen and shower area, also one no. self catering 3 bed family unit, all for short term letting, tourist accommodation and connection to existing waste water treatment system, including also a 3 bed Managers staff accommodation unit
The development consists of the following; 1. Retention and completion of 3 tourist accommodation buildings, Unit A; Two no. 3 bedroom family units, Unit B1; Five no. single bedrooms with dining/living kitchen and shower area, also one no. self-catering 3 bedroom family unit, Unit B2; Five no. single bedrooms with dining/living, kitchen and shower area, also one no. self-catering 3 bed family unit, all for short letting tourist accommodation, and a separate 3 bedroom Mangers staff accommodation unit, 2. Planning permission for relocation and repositioning of the 3 bedroom Managers staff accommodation unit to form a traditional courtyard design style of tourism accommodation provision in keeping with the rural character of the area, removal and decommissioning of existing waste water treatment system and the replacement of same with a new secondary treatment system including a polishing filter
1. retention and completion of 3 tourist accommodation buildings, Unit A: Two no. 3 bedroom family units, Unit B1: Five no. single bedrooms with dining/living, kitchen and shower area also one no. self-catering 3 bedroom family unit, Unit B2: Five no. single bedrooms with dining/living, kitchen and shower area, also one no. self-catering 3 bed family unit, all for short term letting tourist accommodation and a separate 3 bedroom Managers staff accommodation unit. 2. Planning permission for relocation and repositioning of the 3 bedroom Managers staff accommodation unit to form a traditional courtyard design style of tourism accommodation provision in keeping with the rural character of the area, removal and decommissioning of existing waste water treatment system and the replacement of same with a new secondary treatment system including a polishing filter
1. Retention and Completion of 3 tourist accommodation buildings, Unit A; Two no.3 bedroom family units, Unit B1; Five no. single bedrooms with dining/living kitchen and shower area, also one no. self-catering 3 bedroom family unit, Unit B2; Five no. single bedrooms with dining/living, kitchen and shower area, also one no. self catering 3 bed family unit, all for short letting tourist accommodation, and a separate 3 bedroom Managers staff accommodation unit and conversion of storage area to bedrooms. 2. Retention of change of use of part of existing Puddenhill Equestrian Centre to incorporate ancillary storage and play areas, play centre, conversion of part of kitchen area to staff accommodation bed rooms including amendments to elevations. 3. Planning Permission for relocation and repositioning of the 3 bedroom Managers staff accommodation unit to form a traditional courtyard design style of tourism accommodation provision in keeping with the rural character of the area, provision of stairwell, removal and decommissioning of existing waste water treatment system and the replacement of same with a new secondary treatment system including a polishing filter and provision of a new surface water drainage system to appropriate modern operational standards and codes of practice to serve the overall development together with all ancillary site works. 4. Erection of solar panels to roof of existing centre.
The construction of a 24 metre high free standing communications structure carrying telecommunications equipment, together with associated exchange cabinets, fencing access gate and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
To construct a single storey style dwelling and detached domestic garage, form new entrance from public road, install waste water treatment system and percolation area, together with all associated site works
The brief summarizes the pattern across all 413 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 231081The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief