Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 221 decisions within 5 km, 3 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of new 22-unit housing development consisting of the following: 6 No 4 bedroom detached dwellinghouses, 2 No 3-bedroom semi-detached dwellinghouses, 10 No 3 bedroom townhouses, and 4 no 2 bedroom townhouses, new vehicular entrance, storm and surface water sewers including attenuation system, public lighting, boundary walls, footpaths, open spaces, new entrance to existing dwellinghouse to the north west together with all other ancillary site works
A new dwelling, connection to mains sewer, entrance and all associated site works
The demolition of existing rear extensions, construction of a new two-storey rear extension and all ancillary site works
The construction of 2 semi-detached two storey dwelling houses with associated car parking off existing private passageway (which is accessed off Moore St.), connection to main services together with all associated site works
An extension to existing dwelling and ancillary works
The construction of 2 dwelling houses, each with a vehicular entrance off existing private passageway (which is accessed off Moore St.), connection to main services together with all associated site works
The brief summarizes the pattern across all 221 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23529The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief