Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 337 decisions within 5 km, 7 exact-site or onsite candidate records, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a motorhome park with individual pitches, boundary fencing and all associated works.
(1) CONSTRUCT A MOTORHOME PARK WITH ASSOCIATED INDIVIDUAL PITCHES, ACCESS ROADS AND PARKING FACILITIES, (2) CONSTRUCT A RECEPTION / FACILITIES BUILDING CONTAINING A RECEPTION AREA, TOILETS, SHOWERS AND LAUNDRY ROOM, (3) CONNECT TO PUBLIC SERVICES AND (4) CARRY OUT ALL OTHER ASSOCIATED SITE WORKS RELATING TO THE DEVELOPMENT
UPGRADES TO AND INCREASED CAPACITY OF THE EXISTING MUNCIPAL WASTEWATER TREATMENT PLANT (WWTP) AND CROMWELL'S BRIDGE PUMPING STATION(PS) IN KENMARE COUNTY KERRY AND COMPRISES PRIMARILY THE FOLLOWING ELEMENTS: UPGRADE OF THE EXISTING KENMARE WWTP: THE EXISTING INLET CHANNEL, CONTROL PANELS, OXIDATION DITCH, TWO SLUDGE HOLDING TANKS WILL BE DECOMMISIONED AND ALL REDUNDANT CIVIL INFRASTRUCTURE AND MECHANICAL AND ELECTRICAL (M&E) ASSETS WILL BE REMOVED. A NEW INLET WORKS, TREATMENT SYSTEM AND ASSOCIATED PUMPING AND STORAGE INFRASTRUCTURE WILL BE CONSTRUCTED. A NEW MOTOR CONTROL CENTRE (MCC) KIOSK AND A NEW DOSING KIOSK WILL ALSO BE CONSTRUCTED, ALONG WITH ALL ASSOCIATED ANCILLARY WORKS - UPGRADE OF THE EXISTING CROMWELL'S BRIDGE PS: THE EXISTING INLET WORKS, GRIT SEPARATOR, WET WELL,CONTROL BUILDING (INCLUDING DRY WELL) AND STORM TANK WILL BE DECOMMISSIONED AND ALL REDUNDANT CIVIL INFRASTRUCTURE AND MECHANICAL AND ELECTRICAL (M & E) ASSETS WILL BE REMOVED. A NEW WET WELL, AND ASSOCIATED SEWER, A NEW STORM TANK AND RETAINING WALL WILL BE CONSTRUCTED. AN ODOUR TREATMENT SYSTEM AND VENT STACK WILL BE CONSTRUCTED. A NEW MOTOR CONTROL ( MCC) KIOSK AND A NEW DOSING KIOSK WILL ALSO BE CONSTRUCTED, ALONG WITH ALL ASSOCIATED ANCILLARY WORKS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND HIS INCLUDED WITH THE APPLICATION.
(1) CONSTRUCT A FIRST FLOOR EXTENSION TO THE REAR OF MID TERRACE 2 STOREY DWELLING HOUSE, (2) RENOVATION INCLUDING THE INSTALLATION OF NEW WINDOWS AND DOORS, (3) INSTALLATION OF 2 NO. VELUX WINDOWS IN THE EXISTING PITCHED ROOF ON THE FRONT ELEVATION AND (4) ANCILLARY SITE WORKS
DEMOLISH EXISTING DISUSED SINGLE STOREY SHEDS AND TO CONSTRUCT A NEW 2 STOREY DWELLING HOUSE INCLUDING ALL NECESSARY ANCILLARY WORKS
(1) CONSTRUCT A FIRST FLOOR EXTENSION TO THE REAR OF A MID TERRACE TWO STOREY DWELLING HOUSE (2) RENOVATIONS INCLUDING THE INSTALLATION OF NEW WINDOWS AND DOORS (3) THE INSTALLATION OF 2 NO. VELUX WINDOWS IN THE EXISTING PITCHED ROOF ON THE FRONT ELEVATION
The brief summarizes the pattern across all 337 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360456The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief