To construct a single storey dwelling house, domestic garage, secondary onsite sewerage treatment system, bored well, new entrance and all ancillary site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Knocknagull , Dunlavin , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 245 nearby planning records within 5 km where a location match is available.
- Matched source
- 23853
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Construct a new milking parlour, slatted unit with associated storage tanks, concrete apron, silage pit and storage tank, new farm entrance and all associated site works
Side extension to existing bungalow, new domestic garage and ancillary works
On planning register reference 18/97 (single storey dwelling (205sqm), detached garage (38.33sqm), new vehicular access, new septic tank and percolation area and associated site works)
Single storey dwelling (205.0 sqm), detached garage (38.33 sqm), new vehicular access to site, new septic tank and percolation area, all above with associated site works
On granted PRR 18/97 (single storey dwelling (205.0 sqm), detached garage (38.33 sqm), new vehicular access to site, new septic tank and percolation area, all above with associated site works)
The brief summarizes the pattern across all 245 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 23853The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief