Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,587 decisions within 5 km, 2 exact-site or onsite candidate records, and 183 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
183 structured nearby appeal records.
183 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of the retention of already constructed foundations, rising walls and sub-floor of single storey structure and permission is sought to complete construction of single storey structure to be used as home gym with shower room and store and all associated site works.
For a single storey dwelling, domestic garage, installation of new proprietary waste water treatment system and polishing filter together with all associated site works. The development also includes new domestic entrance with access via an existing shared entrance and private roadway
STRATEGIC INFRASTRUCTURE DEVELOPMENT (ABP Decision) 220 kV Gas Insulated Switchgear substation, 2 no. 220 kV underground circuits forming a loop-in/loop-out to the existing Maynooth-Woodland 220 kV Overhead Line and 6 no. 220 kV underground circuits and associated low voltage and communication underground cabling connecting the proposed substation with electricity transformers within the Intel Ireland Facility, and all associated and ancillary site development works.
The construction of a new detached single storey low profile type dwelling along with a detached single storey low profile domestic garage, together with access from public road via new recessed entrance at location of existing entrance, installation of a new proprietary waste water treatment system together with all associated landscaping, site works and services, all
For a new chemical tanker storage compound located north of FAB 10. The proposed development consists of a modification and alterations to previously permitted and partly built development under planning application Reg. Ref. 19/1054. The proposed development comprises of the following: (1) Chemical Tanker Storage Compound. A chemical storage compound housing 3 no. parked chemical tanker trailers complete with bunded area, steel canopy and adjacent loading bay with bunded fixed tank (12,000 litres). The chemical tanker storage compound is approximately 220 square metres and the steel canopy is sized 13 metres x 11 metres approximately. (2) Site works. The proposed development includes minor modifications to previously permitted roads and underground utilities, paths, fencing, site lighting, signage and also includes miscellaneous site works. This application consists of a variation to a previously permitted development on an activity for licence under Part IV of the Environment Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A Natura Impact Statement ("NIS") accompanies this application, and will be available for inspection or purchase at the office of the Planning Authority. This is a site to which the Chemicals Act ( Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
(1) Mound The substantial removal of an existing man made earth and stone mound sized approximately 300 metres x 150 metres and up to approximately 18 metres high and approximately 380,000 metres cubed located directly North of Fab 10 and Fab 14. (2) Yard The construction of a yard area housing site supporting functions, utilities and buildings sized 300 metres x 150 metres approximately on the site of the removed mound area, as further described hereunder. (i) Waste Water A waste water tank sized 51 metres by 33 metres and 12 metres high and a yard housing tanks and equipment. (ii) Balance Tank A site waste water (below grade) balance tank sized 35 metres x 25 metres. (iii) Air Separation Unit An Air Separation Unit (ASU) compound and associated 4 no. towers 43 metres high, cooling towers, associated equipment and a single storey compressor building sized 450 square metres and circa 25 metres high, and 2 no. single storey Electrical buildings sized 120 square metres gross and 7 metres high. (iv) Electrical Buildings 4 no. Electrical buildings, all elevated single storey buildings with a gross area of 648 square metres and 6 metres high. (v) Storage Tanks A yard area housing bulk storage tanks for liquid oxygen, waste solvent storage and hydrogen and their associated tanker unloading. (vi) Waste Water Holding Tanks A series of modular waste water holding tanks and associated equipment located in yards with connecting pipebridges. The proposed tanks range from 5 metres high to 20 metres high. (vii) Tanker and Truck Staging Yards A tanker and truck holding and staging yard sized circa 80 x 40 metres located to the North of the proposed development. (3)Site Works The proposed development includes linking pipe-bridges to the Fab 10, Fab 14 and Fab 24 support buildings, site development works and a surface water attenuation tank, site utilities, site lighting, separation walls, roads, landscaping and all associated site works. This application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this application. This is a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies. Revised by SFI
The brief summarizes the pattern across all 1,587 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23985The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief