The items which Planning Retention apply are as follows: I. Alterations to Unit 12E: 1. Ground Floor: Change of use of 4m2 of warehouse floor area to office floor area, 5rn2 of warehouse area to staff facilities & 60m2 of warehouse area to ESB Substation floor area due to relocating a standalone substation into Unit 12E. 2. First Floor: Internal layout adjustments resulting in an overall reduction of 3rn2 of office area & reduction of 11 m2 of staff facilities area. 3. Second Floor: Change of use of 10m2 of staff facilities area to office area. 4. Elevational adjustments with no associated area change. 5. Addition of 3,891sqm of Solar PV Panels. II. Alterations to Unit 12F: 1. Addition of internal two storey steel mezzanine (2,112m2 total area). 2. Minor Elevational adjustments with no associated area change. 3. Addition of 170sqm of Solar PV Panels. III. Site Plan alterations: 1. Addition of an electric sliding gate & pedestrian gate at the main access to the development and associated extension of existing fence. 2. Addition of 1.5m high paladin fence to protect existing open water course and associated landscape alterations.3. Previously proposed fence and gate removed at HGV /car access at entrance of shared yard between units 12E & 12F removed and provision of additional carpark spaces in part of HGV Yard of Unit 12E. 4. Sprinkler tank & pumphouse relocated to South-West corner of the site and proposed adjacent fence extended to secure the full cul de sac turnabout. 5. ESB Substation relocated to the internal North-West comer of Unit 12E as per item 1.1 above. 6. Proposed fence at northern site boundary relocated from proposed location at centreline of existing hedgerow to facilitate retention of the existing hedgerow & 75m of previously proposed surface water culvert now constructed as open ditch upstream of remaining culvert as per granted planning permission. Carpark at Unit 12F rearranged due to this open ditch/culvert adjustment. 7. Associated site works and landscape adjustments. Note: All other details remain as per the granted applications Reg. Ref. 21/2042 & 22/1125.
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Unit Nos 12E and 12F Ashbourne Business Park , Killegland , Ashbourne
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
20% of nearby decided applications were refused. The preview found 881 nearby planning records within 5 km where a location match is available.
- Matched source
- 24381
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
Planning Permission for Alterations to an existing Planning Permission Reg. Ref. 212042 for warehousing development for 2 No. units (Unit 12E & Unit 12F) at our site. The alterations are as follows: I. Alterations to Unit 12E: 1. Internal adjustments to office/staff facilities layouts to facilitate fire safety requirements resulting in: a. Change of use of 49m2 of warehouse floor area to staff facilities floor area on the ground floor plan; b. Change of use of 1m2 office floor area to staff facilities floor area on the ground floor; c. Addition of 3rn2 of office floor area & 19m2 of staff facilities floor area at the 1st floor; d. Minor alterations to internal layouts with no associated area change. 2. Addition of 12 no. dock levellers to the building's western elevation. II. Site Plan alterations: 1. Alteration to the south-western site boundary, extending the site area from 7.11to 7.73 ha (primarily providing addition of HGV ancillary yard). 2. Addition of grass verge in carparking areas; 3. Relocation of bicycle parking; 4. Extension of previously approved estate access road with associated site layout adjustments. 5. Relocation of previously granted ESB Substation on site to facilitate the extended access road and yard. Ill. Associated drainage adjustments due to the above alterations. Note: All other details remain as per the granted application Reg. Ref. 212042
A development, which will represent an extension to the existing Primeline Logistics facility at Unit 12 Ashbourne Business Park, will comprise the construction of 2 No. warehouses (Units 12E and 12F) with ancillary offices and staff facilities and associated development as follows: Unit 12E will have a maximum height of 16.55 metres with a gross floor area of 28,503 sq m comprising warehouse area (26,745 sq m), ancillary office areas (796 sq m) and staff facilities (962 sq m); and Unit 12F will have a maximum height of 15.7 metres with a gross floor area of 4,854 sq m comprising warehouse area (4,260 sq m), ancillary office areas (278 sq m) and staff facilities (316 sq m).The development will also include: the extension of the Ashbourne Business Park internal estate road and provision of internal access/egress spurs; pedestrian access; 151No. car parking spaces; bicycle parking; 58 No. HGV parking spaces; HGV marshalling yards; 5 No. level access goods doors; 24 No. dock levellers; gates; signage; lighting; ESB substation; sprinkler tank; pump house; external canopies; boundary treatments; hard and soft landscaping; and all associated site development works above and below ground. The lands are part bounded by agricultural lands to the south, east and north and warehouse Unit Nos. 12 A - D in Ashbourne Business Park are adjacent to the site to the south-west. Significant Further information/Revised plans submitted on this application.
The construction of 2 No. warehouses (Units No. 1 and 2) with ancillary offices and staff facilities and associated development as follows: Unit 1will have a maximum height of 18.6 metres with a gross floor area of 8,181 sq m comprising warehouse area (7,165 sq m), ancillary office areas (372 sq m) and staff facilities (644 sq m); and Unit 2, which includes a workshop, will have a maximum height of 18.3 metres with a gross floor area of 7,912 sq m comprising warehouse area (7,112 sq m), ancillary office areas (136 sq m) and staff facilities (664 sq m). The development will also include: the extension of the Ashbourne Business Park internal estate road and provision of internal access/egress spurs; pedestrian access; 84 No. car parking spaces; bicycle parking; 25 No. HGV parking spaces; HGV marshalling yards; 2 No. level access goods doors; 14 No. dock levellers; gates; signage; lighting; sprinkler tank; pump house; balconies facing east and north east; canopy; boundary treatments; hard and soft landscaping; and all associated site development works above and below ground. The lands are part bounded by agricultural lands (to the east and north); Unit No. 20, Ashbourne Business Park is adjacent to the site to the south-west; Unit No. 12D, Ashbourne Business Park is located to the south-east of the lands. Significant further information/revised plans submitted on this application
A new ESB substation and switch room to serve the proposed warehouse development granted under planning reference 21/2041 to including all associated site works
The development consists of A) Retention of the as-constructed changes to the workshop, drivers’ facilities, and truck wash as previously approved under Planning Permission Ref. 21/2041. B) Permission for modification to the approved development under Ref. 21/2041 including: Relocating the permitted warehouse, changes to car parking layout and the reduction in total floor area of the warehouse from 7912sq m to 4721sq m, Incorporating ancillary offices and staff facilities, Provision of roof smoke vents, Dedicated loading area with associated dock levellers, all hard and soft landscaping, HGV parking, signage and all associated site development works
The brief summarizes the pattern across all 881 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 24381The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.