Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 276 decisions within 5 km, 3 exact-site or onsite candidate records, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct silage pit with concrete apron and 7 span cubicle shed with slatted tanks and all associated ancillary works
Construct a 16unit milking parlour, slatted shed and cubicle house, collecting yard and drafting area
Construct two Special Education Needs (SEN) classrooms in a single storey flat roof detached building located to the rear of the main school building with associated external play space, with amendments to the existing sports grounds fence, with addition of gate access and new 2.2m boundary fence to the sports grounds and all associated site works.
Construct a three classroom extension to include one general purpose classroom and a two classroom ASD unit and all associated works
Vary existing grant of planning permission (ref:21304) to consist of change of house design, change of house position on site and all associated site works
Construct a dwelling house (with two storey and single storey elements), foul effluent treatment system with percolation area, use of existing access, bored well, demolition of existing habitable dwelling on site and all associated works
The brief summarizes the pattern across all 276 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460691The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief