Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 937 decisions within 5 km, 1 exact-site or onsite candidate record, and 90 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
90 structured nearby appeal records.
90 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development comprising total of 15,717 square metres of light industrial and warehouse floorspace, to include ancillary office floorspace, plus a creche (271 sq. m), a cafe (175 sq. m) and 1,037 sq. metres of office floorspace and 88 dwellings – 15no. 4 bedroom, 53 no. 3 bedroom and 20no.1 and 2 bedroom. The development includes on site car and bicycle parking, the provision of services, landscaping proposals (including SUDS), provision of roads, ancillary site development works and a new vehicular entrance to the R772. All on a site of 7.45 hectares
Ten year permission for 16498 sqm mixed development comprising of one crèche building, one neighbourhood centre building, one nursing home building and four office buildings on 12.06 acres / 48809 sqm site, all together with all infrastructure works to service this development, including car and cycle parking, connection for foul drainage and local water supply, landscaping road and ancillary site works
The development of grid connection infrastructure comprising the laying of ca. 3.3 kilometres (3,300 metres) of Medium Voltage underground electricity cables and associated infrastructure substantially under public roads and private lands to connect the solar photovoltaic (‘PV’) energy development on lands at Ballinaclough, Rathnew, Country Wicklow (approved under Register Reference 161380) to a new Medium Voltage electricity substation and to a new joint slab box on private land near L95113 road in, or in the vicinity of the townlands of Ballinaclogh, Ballynabarny and Ballybeg, County Wicklow
Extension to rear of dwelling, and proposed front porch to dwelling and associated works
Existing dwelling as constructed after fire damage along with steel container used for storage. Permission is also sought for upgrade of effluent disposal system to current EPA standards along with all associated site works and services
195m storage shed to rear of dwelling along with all associated site works and services
The brief summarizes the pattern across all 937 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460756The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief