Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,381 decisions within 5 km, 10 exact-site or onsite candidate records, and 122 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
122 structured nearby appeal records.
122 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for the construction of a new two-storey multi-purpose tertiary education building extension to the North-East of the existing Drogheda Institute of Further Education school building consisting of: Multi-purpose space, teaching /practice spaces, social areas, administration areas and ancillary spaces, the total internal area of circa 1,713.00m². Additionally, the development will include all associated site works, including car and bicycle parking, site services, and connections to facilitate the development
Permission for the construction of a stand alone 2 storey sports building (574m2 approx.) consisting of 4 no. changing rooms, sanitary facilities, 1 no. multipurpose room, servery, storage and associated circulation. Works to include all required service connections, new car parking, new access road and all associated site works
The Retention development consists of (i)A change from previously permitted grass sports pitch to an all-weather pitch, (ii)A change to the pitch surrounding fence from the granted 1.2m high fence (under Reg Ref 12/510041) to a pitch surrounding fence that varies in height from 3m-5m and (iii) 2 no. additional floodlighting columns, at the existing Sports Pitch.
Retention & Permission for 1) Retention of minor relocation of previously approved prefabricated detached single storey educational building (Reg. Ref. 206) and 2) Single storey extension to same containing 2 no. classrooms and 2 no. offices, and associated site works
Retention permission for an existing attic conversion, roof lights to front and rear elevations, a dormer roof window to the rear elevation and a ground floor rear extension including all associated site development works
Permission for a new prefabricated detached single storey building containing 5 number classrooms with toilet block and associated site works
The brief summarizes the pattern across all 1,381 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460801The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief