Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 105 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) Renovations to existing dwelling house and extension to rear of existing dwelling house (B) demolition of existing defective roof and replace with new (C) Alternations to existing elevations including construction of new porch to front of existing dwelling, (D) Construction of new entrance walls and piers, along with all ancillary site works
To retain the dwelling house and shed within revied site boundaries
CONSTRUCT A NEW DWELLING HOUSE, DETACHED GARAGE, CONNECTION TO A MECHANICAL TREATMENT UNIT, POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
CONSTRUCT A PRE-CAST CONCRETE CATTLE ROAD UNDERPASS WITH EFFLUENT HOLDING TANK TOGETHER WITH ALL ASSOCIATED SITE WORKS TO CONNECT FARM LANDS
(01) REMOVE THE EXISTING ROOF STRUCTURE, FIRST FLOOR, FRONT PORCH AND WESTERN SIDE GABLE WALL FROM THE EXISTING DWELLING HOUSE, (02) DEMOLISH TWO SINGLE STOREY EXISTING OUT BUILDINGS INCLUDING PART OF THE EXISTING ROAD SIDE FRONT BOUNDARY (03) MAKE ALTERATIONS AND RENOVATIONS TO THE EXISTING DWELLING HOUSE OF INTERNAL MODIFICATION TO THE EXISTING DWELING HOUSE OF INTERNAL MODIFICATION TO THE EXISTING FLOOR LAYOUT AND ELEVATION CHANGES THROUGHOUT, (04) CONSTRUCT A NEW PORCH TO THE FRONT ELEVATION AND REBUILD A NEW WESTERN HOUSE GABLE. (05) CONSTRUCT AN EXTENSION TO THE SIDES OF THE EXISTING DWELLING HOUSE (06) CONSTRUCT A NEW HIGH-LEVEL ROOF TO ACCOMODATE FIRST FLOOR ACCOMMODATION AND STORAGE INCLDUING THE INTRODUCTION OF NEW ROOF SKY LIGHTS AND FIRST FLOOR GABLE WINDOW. (07) DECOMMISSION THE EXISTING SITE ENTRANCE AND CONSTRUCT A NEW SITE ENTRANCE WITH SPLAYED ENTRANCE WALLS WITH ASSOCIATED ACCESS GATES. (08) INSTALL A NEW SECONDARY WASTEWATER TREATMENT SYSTEM. THE PROPOSED INSTALLATION WILL INCLUDE A MECHANICAL TREATMENT UNIT FOLLOWED BY A POLISHING FILTER, INCLUDING ALL ASSOCIATED ANCILLARY SITE WORKS
CONSTRUCT A CUBICLE HOUSE FOR DAIRY COWS WITH A SCRAPER SYSTEM AND ASSOCIATED SLURRY
The brief summarizes the pattern across all 105 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25263The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief