Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 148 decisions within 5 km, 4 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) Construction of a single storey 2No. classroom ASD unit, Mainstream classroom and SET room extension to the rear of the existing school and erect signage, B) Extend existing staff carpark, C) Relocate existing basketball court, extend existing play area together with new sensory garden, D) Relocate existing gas tank, E) proposed new plant, F) Demolishing and removing existing prefab, together with connections to all existing services along with all associated site works.
The following: (i) to change the opening hours from 9am-3pm at present to 7:30am-6:00pm (ii) to add the type of service to include breakfast club, preschool, part time and afterschool and (iii) to amend condition no. 2 of planning permission ref. no. 13/51. The amendment will allow for an increase in the number of children to be accommodated in the playschool on any one day from 26 to 36
Alter and extend the existing national school, alter the existing front pedestrian entrance and erect signage, along with all associated works
The demolition of an existing disused building and the construction of a dwelling house & domestic garage, to be served by connection to water supply, connections to existing public foul and surface water drainage infrastructure. Permission to widen the existing vehicular entrance, build a new front boundary wall and all ancillary works
(1) construction of a first floor to existing rear single storey extension, which will consist of a bedroom and family bathroom, (2) construction of a first floor to existing gable garage, which will consist of an en-suite and storage space, and (3) to replace existing front door to garage with new window to match existing and all associated site works
Installation of a floodlighting system to the training area. The works will include the erection of 6no. floodlighting poles with 2no. 500 watt LED lights at the top of each pole
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560472The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief