Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 684 decisions within 5 km, 4 exact-site or onsite candidate records, and 39 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
39 structured nearby appeal records.
39 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development comprising 93 no. residential units and a childcare facility at Saunders Bridge, Ardmore Road, Mullingar, Co. Westmeath, on a site of 4.48 Ha. The proposed development will consist of: 81 no. 2-storey housing units; 5 no. 3 bed mid terraced units, 54 no.3 bed semi-detached units, 22 no. 4 bed semi-detached units and 12 no. 2 bed apartment units in a singular block, a creche facility (circa. 242 sqm), the formation of 3 no. vehicular access points off the established residential access road and associated residential road network, active travel route, 184 no. car parking spaces and 220 no. cycle parking spaces. The proposal includes all associated hard and soft landscaping, boundary treatments, footpaths an ESB Sub-Station, and all other ancillary works above and below ground
Development to vary the An Bord Pleanala planning permission reference PL25M.239612 to replace 27 No. granted house types as follows: remove granted house unit numbers 80, 81 & 94 to 118 inclusive consisting of 3 & 4-bedroom 2 & 3-storey houses, to be replaced with 27 No. 3-bedroom 2-storey houses and all associated site works
EXTENSION OF DURATION of planning application 16/6062 The variation of An Bord Pleanala planning permission Ref PL25M.239612 to replace granted house unit numbers 51 & 52 (house type E) with granted end-unit house (type L) also to vary house type/design of 50 No. units as follows: remove granted house unit No I to 32, 34 to 48, 128, 130, & 131 & replace with 12 No 5 bedroom 2-storey + dormer type houses, 4 No 4-bedroom 2-storey type houses, 10 No 5-bedroom semi-detached 2-storey + dormer type houses, 16 No 4 bedroom semi-detached 2-storey & dormer type houses, 2 No 2-bedroom apartments & 6 No 1 bedroom apartments in a 2 & 3 storey block, together with provision of parking spaces, bicycle shed, bin area, and all associated site works
Providing of 2 no. private car parking spaces to be located within the curtilage of House No. 27 Saunders Avenue, re-alignment of the existing Northern boundary wall of Unit 27 Saunders Avenue, as well as providing vehicular and pedestrian access onto the main Royal Canal spine road, along with all associated site works
RETENTION of extension to the rear of my existing dwelling, to include a bedroom
Partial demolition of existing semi-detached dwelling and to construct a new four bedroom dwelling attached to the north elevation of the existing semi-detached dwelling and all ancillary site services
The brief summarizes the pattern across all 684 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560495The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief