Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 42 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish & rebuild the hayshed & permission to RETAIN the machinery shed and all associated site and ancillary works
To carry out reclamation works and filling of lands with imported inert soils, stone and overburden materials to enable the beneficial use of the agricultural lands together with all associated site development works
To construct a dwelling house, garage with a waste water treatment system and percolation area
For development which will consist of the erection of 1 no. permanent health and safety sign including all ancillary site works
To construct a battery storage compound adjacent to an existing 110KV electricity substation. The proposed works will involve the construction of new palisade fencing, bunded concrete plinths, up to 21 no. battery storage units and associated equipment, transformers and all ancillary site works.
For the construction of a dwelling house and wastewater treatment system including ancillary site works
The brief summarizes the pattern across all 42 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 26101The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief