Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 343 decisions within 5 km, 3 exact-site or onsite candidate records, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to erect a new structure consisting of a Gymnasium and for all associated site works to facilitate this development
TO ERECT A NEW STRUCTURE CONSISTING OF GYMNASIUM WITH DISABLED FACILITIES, CONSTRUCT A PUMPING CHAMBER, RISING MAIN, SEWER CONNECTION, DECOMMISSION EXISTING SEPTIC TANK AND FOR ALL ASSOCIATED SITE WORKS TO FACILITATE THIS DEVELOPMENT
(A) PLANNING PERMISSION TO DEMOLISH THE ENTRANCE HALL AND LIVING ROOM ON GROUND FLOOR AND FIRST FLOOR BEDROOM (B) PLANNING PERMISSION TO CONSTRUCT A NEW EXTENSION TO FRONT, REAR AND SIDE OF DWELLING HOUSE AND MODIFY ALTER AND EXTEND TO INCORPORATING SAME TO DWELLING HOUSE (C) PLANNING PERMISSION TO ALTER THE SIZE OF THE WINDOWS ON BEDROOM 2 AND 3 WITH ALL ASSOCIATED SITE SERVICES
(A) RETAIN THE EXISTING DWELLING HOUSE ON SITE 9 WITHIN REVISED SITE BOUNDARIES, (B) PERMISSION TO CONSTRUCT A TWO STOREY DETACHED DWELLING HOUSE, DRIVEWAY AND PARKING AREA ON THE NEWLY CREATED SITE 8A, (C) PERMISSION TO CONSTRUCT A TWO STOREY DETACHED DWELLING HOUSE, DRIVEWAY AND PARKING AREA ON SITE 8, AND (D) PERMISSION TO CONNECT ALL MAINS SERVICES AND PERMISSSIONS FOR ALL ASSOCIATED SITEE WORKS TO FACILITAE THIS DEVELOPMENT
(A) CONSTRUCT AN EXTENSION TO THE FRONT OF THE EXISTING SINGLE STOREY DWELLING, (B) PERMISSION TO MAKE ELEVATIONAL CHANGES TO THE EXISTING SINGLE STOREY DWELLING, AND (C) RETENTION PERMISSION TO RETAIN A DOMESTIC SHED
(A) RETAIN ALTERATIONS MADE TO THE EXISTING DWELLING HOUSES, (B) RETENTION PERMISSION TO RETAIN THE ENTRANCE AND ALL OTHER SITE WORKS AS CONSTRUCTED AND (C) RETENTION PERMISSION TO RETAIN THE EXISTING DWELLING HOUSES AND ALL ASSOCIATED SITE WORKS AND SERVICES AS LOCATED WITHIN REVISED SITE BOUNDARIES
The brief summarizes the pattern across all 343 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660419The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief