Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 391 decisions within 5 km, 1 exact-site or onsite candidate record, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of the following: 1. Construction of a new detached 2 storey dwelling. 2. New proprietary wastewater treatment system & percolation area. 3. New entrance to site. 4. All associated site works. Significant further information/revised plans submitted on this application.
The construction of a single storey garage and all associated site works
The construction of replacement dwelling in place of an existing dwelling and to repurpose the existing dwelling for storage and administrative purposes ancillary to the farm business. To include a new waste water treatment plant and percolation area including all associated site works and new site entrance. Significant further information/revised plans submitted on this application
The construction of replacement dwelling in place of an existing dwelling and to repurpose the existing dwelling for storage and administrative purposes ancillary to the farm business. To include a new waste water treatment plant and percolation area including all associated site works and new site entrance
EXTENSION OF DURATION OF PLANNING PERMISSION AA/180750 - the re-contouring of agricultural land and associated site works using imported clean inert soil and stones within an area of a farm holding of 5.923 hectares (plus the additional access roadway of 0.203 hectares) for the consequential benefit to agriculture. A 5 year planning permission is requested, and during this period 98,043 tonnes of inert soil and stones will be imported for the purposes of land reclamation
The development will consist of the extension to the existing authorised land reclamation works as granted under planning permission AA/180750 and as extended in duration by 23/581 using the same site entrance, site access roadway (0.651 Hectares), wheelwash, portable office and chemical toilet. The proposed works will involve the re-contouring of agricultural land using imported byproduct soil and stones within an area of a farm holding of 5.557 for the consequential benefit to agriculture and all associated site works. A 5 year planning permission is requested and during this period 99,471 tonnes of byproduct soil and stones will be imported for the purposes of land reclamation subject to a maximum of 25,000 tonnes per annum
The brief summarizes the pattern across all 391 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record AA171031The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief