Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 388 decisions within 5 km, 3 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of (1) Construction of a detached single storey farm office/agricultural storage building incorporating office area, sanitary accommodation, chemical and medicine storage areas, (2) Installation of a septic tank and percolation area, (3) Completion of all ancillary site works and associated structures
The development will consist of 1 no. 2 bed seasonal accommodation unit for farm labourers together with new proprietary waste water treatment system and sand polishing filter. The development also includes blocking up of existing unauthorized entrance and using existing entrance to dwelling to access new accommodation and all associated site works
The development will consist of 1 no. 2 bed seasonal accommodation unit for farm labourers together with new proprietary waste water treatment system and sand polishing filter. The development also includes the upgrade of existing entrance and all associated site works
The construction of a new dwelling house, detached garage, waste water treatment plant and percolation area including all associated site works and new site entrance
The retention of new wall to the front, new entrance area and gates, new location of existing office and container stores, ESB sub station and room, boundary fence and bank to storage yards at the rear of existing including drainage and lighting. Permission to close up old entrance, remove hedge to front, form new front boundary hedge and fence, re-site telephone pole inside fence for sightline and construct new parking area
Planning Permission for construction of storage facilities and boundary treatment to service existing authorised scaffolding business at Keenoge, Duleek, Co. Meath comprising of the following: 1. Construction of storage shed for scaffolding, scaffolding planks and ancillary fittings. 2. Construction of storage shed for maintenance, storage and charging facilities for electric fork-lift utilised on site. 3. Construction of security fencing to the boundaries of the site.
The brief summarizes the pattern across all 388 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record AA180286The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief