Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 885 decisions within 5 km, 2 exact-site or onsite candidate records, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
The construction of 3 No. apartment blocks. Each block will be 3 storeys high plus a penthouse, and will contain 9 No. 2 bed and 1 No. 3 bed apartments. Total number of apartments will be 30 No. Planning is also sought for 30 No. parking spaces, external bicycle sheter, bin storage areas along with and all associated site works. Significant further information/revised plans submitted on this application
The development will consist of the installation of sustainable energy compounds to host 1 no. LPG tank and 6 no. modular heat pumps, and all associated site development works
A two storey 16 classroom Primary school building in Ashbourne (Roll Number 20546J), including a two classroom SEN Base. The design also includes a general purpose hall, support teaching spaces and ancillary accommodation, external junior play areas, secure SEN hard and soft play area and a sensory garden. The proposed project also incorporates associated car parking, access road, pedestrian access, bicycle lane, construction of 2 No. external ball courts, landscaping, connection to public services, ESB sub-station and all associated siteworks. Significant further information/revised plans submitted on this application
The development will consist of the installation of sustainable energy compounds to host 1 no. LPG tank and 6 no. modular heat pumps, and all associated site development works
The development will consist of Construction of a dormer extension at the rear with rooflights to the front; Change the existing hip roof to gable roof with attic conversion; internal alterations; and all associated site works
Alterations to existing hip roof to create half hip dutch gable roof to side to accommodate attic stairs to allow conversion of attic into non habitable storage and window to side of half hip dutch gable with roof windows to front roof all with associated ancillary works
The brief summarizes the pattern across all 885 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record AA190862The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief