Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 363 decisions within 5 km, 6 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of plan and elevation changes to domestic garage from that granted under SA/800357. Permission is south for the change of use of part of existing domestic garage to provide After School Care / School Age Service, upgrade of existing wastewater treatment system & percolation area with all associated site works
Extension of operational hours for childcare facility from that granted under AA/200558 (14:00 - 18:00) to 08:00 - 18:00.
The construction of a new storey and a half residence, propriety waste water system and new entrance and the conversion of the existing cottage residence into a playroom, gym and store. Significant further information/revised plans submitted on this application
A new storey and a half residence, propriety waste water treatment system and new entrance and the conversion of the existing cottage residence into a play room, gym and store. Significant further information/revised plans submitted on this application
Development at this site, within part of a sand and gravel pit (P.A. Reg. Ref. QY36, QC 17.QC2085)which is currently under restoration. The development will consist of the recovery of construction and demolition waste using mobile crushing and sreening plant to produce secondary aggregates. The existing site office including welfare facilities will be replaced including provision of septic tank and percolation area. The wheelwash will be upgraded and relocated towards the site entrance. The existing palisade fence at the entrance is to be replaced with a stone wall and separate entrance gate provided for access to the site office. A weighbridge, hard standing area with drainage to oil interceptor, semi-mobile crushing and screening plant and other ancillaries will be provided. The total application area including the site infrastructure covers c. 0.8 ha of lands. The development will be subject to the requirements of a waste management licence (Reg. No. W0265 01) which is currently under consideration by the Environmental Protection Agency (EPA)
(a) the construction of new stone clad entrance wing wall, pillars, boundary wall, mesh panel fencing, (b) removal of existing roadside boundary concrete post & chain-link fencing, (c) the construction of 3 no. mass concrete aggregate storage bays, (d) installation of 1 no. concrete reclaimer unit, (e) all ancillary works. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 363 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record AA200558The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief