Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 686 decisions within 5 km, 5 exact-site or onsite candidate records, and 63 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
63 structured nearby appeal records.
63 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXTENSION OF DURATION OF PLANNING PERMISSION AA151273 - development will consist of a storage building for end of life vehicles, upgrade of entrance and new waste water treatment system together with associated works. (A Waste Permit is required)
The works seeking retention permission include; 1) Retention of the change of use of an existing shed, to a use facilitating waste processing. 2) Retention of concrete yard area and associated 1 full retention separator servicing same. 3) Retention of modified site boundary. 4) Retention of site security palisade fence. 5) Retention of alterations to site layout design to include revised designated ares for storage of End of Life Vehicles. The works seeking planning permission include; 1) Proposed 5 bay monopitch shed to facilitate processing of end of life vehicles. 2) Proposed increase in annual tonnage accepted at the facility to 4,000 tonnes per year. 3) Stormwater drainage infrastructure including proposed soakaway. 4) Works to facilitate the required sightlines along public road from existing site entrance. 5) All ancillary site development works. The above listed works will require a review of the existing 'Waste Facility Permit' which will be sought through a separate application to Meath County Council. Significant further information/revised plans submitted on this application
A storey and half type dwelling, domestic garage, proprietary treatment system and percolation area and complete all ancillary site works. Significant further information/revised plans submitted on this application
A detached storey and half type dwelling, domestic garage, combined vehicular entrance, proprietary treatment system and percolation area and all ancillary site works. Significant further information/revised plans submitted on this application
Development consists of (1) Retention of the substructure including foundations and steel stanchions. (2) Planning permission to complete the construction of the building and (3) Planning permission to construct concrete apron
The development consists of (A) renovation and extending existing single storey derelict cottage with the construction of single storey extension to the side and rear (B) construction of sewerage treatment unit and percolation area (C) construction of domestic store (D) modifications of existing internal drive landscaping (E) and all ancillary site works. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 686 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record AA201047The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief