Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 912 decisions within 5 km, 4 exact-site or onsite candidate records, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention planning permission for change of use from light industrial to Fitness Gymnasium with internal modifications and associated site works
1) Construction of a 655m2 extension to the southern side of the existing commercial building, (2) Construction of a 560m2 first floor mezzanine within the building and (3) All associated site works
Planning permission to erect 430.00 m2 or 111.20 kWp of photovoltaic panels on the roof of our existing commercial building, with all associated site works
Changes to previously granted planning permission (ref. AA/170368) to provide for 72. no photovoltaics panels to the south east roof totaling 110sq. There are no other changes proposed to previously approved planning
The development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23m2 Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045m2 Proposed site works to include the construction of new 25m2 standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48m2 external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.
EXTENSION OF DURATION ON PLANNING REF AA170368: the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2 storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2 storey west block comprising of 17 general classrooms, 4 specialist classrooms, library, offices, staff room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link cirulation. Total floor area of phase 2 extension C.5045m2 Proposed site works to include the construction of new 115m x 80m grass pitch the removal of 3 no. existing ball courts to be replaced with hard play area, 6 no. basketball courts, 1 bicycle stand, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping
The brief summarizes the pattern across all 912 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record AA201525The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief