Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 930 decisions within 5 km, 5 exact-site or onsite candidate records, and 87 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
87 structured nearby appeal records.
87 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A removal of an existing revolving door at the south east elevation at ground floor level of the building/main Hotel entrance. Retention of a single-storey glazed entrance lobby with a pressed metal flat roof located at the south elevation/main entrance of the Hotel inclusive of all associated site and drainage works
Construction of 8 No. New Bedrooms on Floor Levels 2 to 5 of the existing hotel wholly within the existing floor plan, including associated internal glazing, ensuites, reorganization of circulation corridors and associated exterior 8 No. car parking spaces
The development will consist of (1) Installation of a new EV (electrical vehicle) charging facility, 5 No. bays, with associated electrical substation, power charging units, canopy structure, localised ground works, lighting and all other associated works. (2) Relocation of 5 car parking spaces to facilitate the EV charging facility installation within the site
A proposed detached storey and a half style dwelling house with connections to mains sewerage and water, entrance onto public roadway and all ancillaries
The erection of a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with associated antennas and dishes and to remove the existing 15 metre lattice telecommunications structure with antennas (providing an overall height of 17.05 metres). The proposed development is all enclosed within the existing Rath water reservoir fenced compound
The development will consist of a change of use from retail use to retail with ancillary off licence use as previously granted under planning reg. ref: AA140514.
The brief summarizes the pattern across all 930 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record AA201888The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief