Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 305 decisions within 5 km, 3 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
2 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Development consists of retention of a single storey extension to the rear and side of existing single storey dwelling
Retention for a single storey extension to the rear and side of existing single storey dwelling
The development will consist of: a change of use in existing building from restaurant to pastoral center, and from shop to Parish Office with alterations to internal layouts; alterations to elevations; alterations to external terraced area at 1st floor; formation of ope in existing boundary wall shared with St. James' Church (a protected structure) and installation of gateway in place; creation of pathway on lawn within church grounds; all associated site works
The construction of six single storey dwellings (two semi-detached and one terrace of four) the upgrade and relocation of the existing site entrance, sub-division of the site, connection to services and all associated site works. The site is within the curtilage of a protected structure and is situated within the Athboy Architectural Conservation Area. Significant further information/revised plans submitted on this application
To demolish existing single storey dwelling house and outbuilding, construct 3 no terraced two storey town houses facing onto Connaught St, connect to all services including all associated site development works on site located between Connaught St and Church View,
The conversion of the house into two apartments, the refurbishment of the house and a single storey rear extension, the sub-division of the site, connection to services and all associated site works. The house is a Protected Structure and is situated within the Athboy Architectural Conservation Area. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record KA180010The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief