Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 224 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Construction of a storey and a half house; waste water treatment unit and percolation area and new entrance on to the public road
Retention of (1) amendments and alterations to existing floor plans and elevations incorporating the provision of habitable accommodation in roof space (2) Upgrading of percolation area and ancillary site works
The development will consist of a single-storey extension to the existing house; alteration and extension to the boiler room; internal modifications and amendments to existing layouts; construction of a detached single-storey domestic store; internal and external modifications to the Eastern part of the stables; replacement of the existing septic tank and percolation area and all associated site works, connected to existing and proposed onsite services. The house is a Recorded Protected Structure. LA RPS IDs 90441
Construction of a new entrance onto the public road
Outline planning permission to construct five dwellings with waste water treatment systems and percolation areas to EPA recommendation connections to the water supply, a service road and an entrance to the public road. Significant further information/revised plans submitted on this application.
The development consists of the Retention Permission for the following: 1) Construction works to foundation level including new site location of and enlarged foundations for the approved dwellings approx. 5.5m from road edge. 2. Additional demolitions of the original two storey structure. 3. Revised site boundaries. 4. The existing portacabin on the site to provide temporary sanitary facilities for the duration of the project and the security fencing, will all be removed on completion of the works. And Planning permission to complete the development with changes mentioned above and from that granted under planning ref no. 2460681, including all ancillary site developments works
The brief summarizes the pattern across all 224 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record KA190401The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief