Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 229 decisions within 5 km, 5 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Elevational changes and amended floor plans from that granted previously under Planning Ref. No. KA181161, together with all associated site works
The development will consist of the following works; (a) construct an all-weather training pitch (25m x 50m). (b) erect 2.4m high perimeter wire fence with additional 3.6m high netting installed above wire fencing at either end, (6.0m high in total). (c) erect 4no. 15m high lighting columns with floodlighting to illuminate the training pitch, together with all associated site works.
File Ref: 21556 - First floor extension
A first-floor extension to the existing dwelling, a ground-floor extension to the rear of the existing dwelling, alterations to the existing dwelling, demolition of existing extension to the rear of the existing dwelling, demolition of garage and sheds, replacement of the existing septic tank with a proprietary effluent treatment system & percolation area and all ancillary site services
(a) Change of house design, (b) Revisions to site layout plan, (c) Revisions to site boundaries and (d) All ancillary site development works. All previously granted permission under planning reference number KA170890
The development consists of the Retention Permission for the following: 1) Construction works to foundation level including new site location of and enlarged foundations for the approved dwellings approx. 5.5m from road edge. 2. Additional demolitions of the original two storey structure. 3. Revised site boundaries. 4. The existing portacabin on the site to provide temporary sanitary facilities for the duration of the project and the security fencing, will all be removed on completion of the works. And Planning permission to complete the development with changes mentioned above and from that granted under planning ref no. 2460681, including all ancillary site developments works
The brief summarizes the pattern across all 229 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record KA190792The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief