Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 311 decisions within 5 km, 3 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A single storey detached prefabricated temporary building for use as a temporary classroom, temporary connection to the existing waste water disposal system and all associated site works
The change of use from a special needs toilet to a resource room, changes to the elevations, ten new staff car parking spaces and drop-off, a single storey extension to the existing staff room, the construction of a two storey addition containing an autistic spectrum disorder classroom base, store and an assisted wc/shower on the ground floor; one classroom, staff toilets, cleaners store and special education teaching room on the first floor, connection to the existing waste water disposal system and all associated site works
Alterations and a single storey extension providing two new classrooms, one store, one multipurpose teaching room, an autistic spectrum disorder classroom base, activity area, para education room, staff toilets, changes to the elevations, as well as a fenced astro-turf playground, fenced grassed playground, changes to the car parking layout, connection to the existing waste water disposal system and all associated site works
The development will consist of minor demolition works to the existing front porch and two small rear sections, minor elevational alterations; a single-storey extension to the rear, internal layout modifications, decommissioning of the existing wastewater treatment system, and installation of a new wastewater treatment system and associated site works.
The development will consist of the following works; a) a flat roof/lean-to extension to the north of existing building b) revised car park layout from that granted under Planning Ref. No. KA170695 c) the provision of a public amenity park including the formation of pathways, drainage, landscaping, lighting and all associated works within the curtilage of the site d) form new pedestrian crossing & pedestrian entrance to amenity park from public road e) the provision of new community facilities including; a children's playground; Astroturf football pitch including fencing, flood lighting, drainage and all ancillary site works. f) replace existing septic and upgrade to a proprietary waste water treatment system and percolation area. Significant further information/revised plans submitted on this application
The development will consist of a storage container placed at Wilkinstown Community Centre for use as a coffee dock
The brief summarizes the pattern across all 311 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA190875The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief