Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 491 decisions within 5 km, 2 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a part single storey, part two storey dwelling house, installation of a proprietary wastewater treatment unit and percolation area with all ancillary site development works
A proposed single storey kitchen/dining room extension to the side and rear of the existing dwelling house and all ancillaries
A new single storey extension to the South of the existing dwelling, of area 34.8sqm comprising of new home office, gym, and link to existing dwelling, all with white rendered finish and flat roof with zinc facia, along with all ancillary site works
The installation of a biomass heating system and photo-voltaic solar panels within the grounds of Headfort House. Works will include installation of a new biomass boiler and external flue to the ancillary 'hanger' structure (not protected) within the grounds of Headfort House, with associated new layout of underground pipes to adjacent lands and connection to existing services of Headfort House. New surface mounted pipe routes and radiators are proposed to be installed to Headfort House internally. Works also include installation of photo-voltaic solar panels to the roof of the ancillary 'hangar' structure and connection to existing services. A new surface for lorry access is proposed to the front area of the ancillary 'hanger' structure, connecting to the existing access surface. Headfort House is a Protected Structure (NIAH Reg No. 14401713) within the Headfort Demesne Architectural Conservation Area
The upgrading of an existing driving range facility, to include the construction of a new 22-bay covered driving range building, 4 open-air bays, accessible toilets and golf ball processing area. The plans also include the extension of an existing car parking area, installation of a new on-site wastewater treatment system with percolation area, signage, external lighting (including range lighting), landscaping and ancillary site works
Retention & commissioning of a new Kingspan Klargester pumped biodisc sewage treatment plant with raised soil polishing filter bed which replaces original septic tank and soakaway along with any associated siteworks
The brief summarizes the pattern across all 491 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA191683The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief