Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 363 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of; 1) alteration to existing rock road entrance and relocation of entrance gate, 2) new lorry park with associated drainage and lighting, 3) 2 No. new weighbridges and 4) all ancillary site development works
The development for Retention consists of alterations to previously granted planning ref. 24/60593 including additional floor area constructed to warehouse extension, external alterations, revised site layout and ancillary site development works
The development will consist of the erection of a steel portal framed extension to the existing warehouses, retaining perimeter wall around extension, temporary construction site entrance onto public road, and ancillary site development works.
The development will consist of the construction of 4 above ground tanks (520m2 each) for the collection of surface water, 1 above ground firewater tank (520m2), 1 pumphouse (17.4m2), 5 below ground attenuation tanks (73 – 79 m2), 1 electrical control building (17.4m2), 1 wheelwash (91m2) and associated works over a site area of ca. 1.2 ha. The existing site operates under an Industrial Emissions (IE) Licence (Ref. P0519-04)
The development will consist of the erection of a steel portal framed structure to enclose the relocated dust collector for existing board plant and ancillary site development works
The development will consist of a production supply well, pumphouse (25m2), fencing and connection to the existing pumphouse and all ancillary site development works over an application area of c. 0.13 hectares
The brief summarizes the pattern across all 363 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA200177The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief