Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 414 decisions within 5 km, 5 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission to construct a two storey dwelling house, new entrance and install a septic tank system with percolation areas together with all associated site development works on site
The construction of a two storey dwelling house, new entrance and install a septic tank system with percolation areas together with all associated site development works
3 no. two storey dwelling houses, provide new entrance and internal service road, connect to mains water supply, install 3no. sewage treatment systems with percolation areas together with all associated site development works
Revisions to a previous Grant of Permission, Ref. No. KA/161437 and will include the following: (A) The previously granted Pre-School Sessional Childcare Facility is also to be used for After-School Care with a revision to operating hours from that previously granted. There will be no increase in the number of children to be accommodated on the premises. (B) To revise Condition No. 2(b) of the previous permission to allow the following operating hours: The Pre-School Sessional Childcare shall operate from 9.00am until 12.00p.m. The Afterschool Care shall operate from 2.00pm until 6.00pm. Days of operation to be Monday to Friday inclusive. (C) To revise the design of the previously approved detached Pre-School Sessional Childcare facility to include for an increase in height to provide an attic storage area, with 3 no. roof-lights and to make revisions to the internal layout. (D) All ancillary site development works
The development consists of and will consist of revisions to a previously permitted childcare facility granted under Planning Ref.s' No's: KA/161437 and KA/180203 and will include the following: Retention Permission for: (A) Variations to the Childcare/Creche building made during construction to include an increase in height of first floor attic area and minor elevational details. (B) Ancillary site development works. Planning Permission for: A change in the Childcare/Creche facilities operating hours which will be to start at 8am in the morning, open through until 6pm in the evening. (B) The total number of childcare places is to be increased to 22. (C) To use the first-floor area of the Childcare/Creche to facilitate the increase in numbers and will include minor revisions to the internal layout. (D) To provide additional car parking spaces. (E) To revise the site boundaries from those previously granted. (F) All ancillary site development works
The upgrade of the Carlanstown Wastewater Treatment Plant and will generally comprises the following: construction of a storm water holding tank complete with internal cleaning system, internal storm return pumps, access stairs and platform, construction of new storm water forward feed and final effluent wash water pumping stations, installation of a kiosk enclosure to house electrical switchgear and all ancillary site works
The brief summarizes the pattern across all 414 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA200378The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief