Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 216 decisions within 5 km, 6 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission is sought for the following: A. Construct new 6 bay workshop extension to existing engineering workshop. B. Retain existing electrical panel room, together with carparking and site development works
The provision of a maintenance workshop and a lorry wash either side of the existing garage and an associated internal access road; provision of a store extension and an amenity block/office extension to the existing engineering workshop; provision of a chemical store and 2 No. chemical storage tanks within bunded area; provision of a security building at the site entrance; car parking, and all associated site development and infrastructure. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence
The development will consist of the provision of a Biogas Upgrading Plant to connect to a permitted Anaerobic Digestion (AD) Facility (Meath County Council (MCC) Reg. Ref. 22/1214). The biogas upgrading plant will comprise 2 No. horizontal tanks, dry cooler, pumps, chillers, and all associated infrastructure, internal access roads and loading area. The biogas upgrading unit, which will connect to the AD Facility, will also connect to the National Grid via a biomethane injection point, which will be housed in a Biomethane Network Entry Facility (BNEF). The development also provides for the relocation and reorientation of the permitted engineering amenity block / office extension (MCC Reg. Ref. 22/696) which will now be located to the north-west of the existing engineering workshop. The proposed development will also include all associated site development, drainage and infrastructure works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence.
The development consists of the retention of an Ammonia Scrubber, Wastewater Treatment Tank, and extension to the Bio-Diesel Building and all associated development works. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence
Two detached single storey industrial storage buildings of 512 sqm each and a third detached single storey industrial storage building of 726 sqm, providing a total storage area of 1750sqm, including all connections to existing rainwater drainage system and all other ancillary site works. The buildings are to be used as an extension of the operations currently undertaken on site.
Planning permission to amend a permitted Biodiesel Manufacturing Facility (Meath County Council Reg. Ref. KA/160786; as amended by Reg. Ref. KA/180354), on a site of c. 0.62 hectares at College Road, College, Nobber, Co. Meath. The development will consist of the extension to the existing Biodiesel Manufacturing Facility across all 3 no. floor levels resulting in an increased floor area of c. 354sqm; the provision of an external stairs; the provision of an off-loading bund area and all ancillary site development works above and below ground. The application relates to development which comprises or is for purposes of an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence).
The brief summarizes the pattern across all 216 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA200727The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief