Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 203 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Change of two-storey house and garage designs and for re-location of both. Also for revised site boundaries and to include for all ancillary site works previously granted under Planning File Ref. No. KA/150331
To retain forecourt canopy, sinage and associated site works
To use existing entrance and to construct a stand alone farm produce store with concrete yard to front together with all works ancillary to the overall development on site
(1) to construct a two storied type dwelling house and a detached domestic garage (2) to install a proprietary waste water treatment unit and percolation area (3) to make a new entrance onto the road (4) all ancillary site development works
The re-contouring of agricultural land, a new entrance, pallisade fencing and pallisade security gates, temporary installation of a wheel wash and portaloo on site for the duration of the works and all ancillary site works over a three year period using approximately 50,000 tonnes of imported, clean, inert soil and stone within an area of 5.08 hectares.
The development will consist of the further re-contouring of agricultural land to include additional lands within an overall area of 10.6 hectares. Works will take place over a five-year period and will use approximately 100,000 tonne of imported clean, inert, soil and stone and all ancillary site works
The brief summarizes the pattern across all 203 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA200946The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief