Retention of (1) existing dormer style log cabin operating as tourism accommodation ancillary to adjoining campsite and associated vehicular entrance and existing treatment system (2) existing campsite area gravel pathways and external lighting and associated services (3) 6 no. glamping yurts and ancillary stands forming part of existing camp site (4) toilets block used as part of yurt/camping area and permission is sought for (1) upgrading of existing treatment system and percolation area serving the existing log cabin and glamping yurts/camping area (2) closure of existing entrance to field, (3) signage (4) and all ancillary site works. Significant Further information/Revised plans submitted on this application
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Drumsawry Or Summerbank , Oldcastle , Co Meath
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 182 nearby planning records within 5 km where a location match is available.
- Matched source
- KA200995
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
The development will consist of the following: Retention Permission for (A) A proprietary waste water treatment system and percolation area (B) Ancillary site works and landscaping. Planning Permission for: (A) To construct a one and a half storied type three bedroom self catering tourist accommodation building (B) To upgrade the existing waste water treatment system and percolation area (C) To provide additional car parking spaces (D) To remove 1 No. Yurt structure to facilitate the proposed new building (E) and all ancillary site works.
The development will consist of the following: Retention Permission for (A) A proprietary waste water treatment system and percolation area (B) Ancillary site works and landscaping. Planning Permission for: (A) To construct a one and a half storied type three bedroom self catering tourist accommodation building (B) To upgrade the existing waste water treatment system and percolation area (C) To provide additional car parking spaces (D) To remove 1 No. Yurt structure to facilitate the proposed new building (E) and all ancillary site works
Retention permission for (1) Existing dormer style log cabin operating as tourism accommodation ancillary to the adjoining campsite (2) Waste water treatment unit and percolation area (3) All ancillary site works. Permission for (1) upgrade of existing waste water treatment unit and percolation area (2) To close up an existing entrance and remove hardcore surfaced driveway (3) To construct an outdoor recreational and arts room with covered patio area ancillary to the dormer style log cabin (4) To construct a rental bike storage shed adjacent to existing on site meeting room (5) To construct a covered out door wellness, sauna and hot tub area (6) To construct a barbeque hut type building (7) and all ancillary site works
(1) retention permission,:retention of existing toilet and washroom facilities in existing building for existing campsite use, (2) planning permission: permission for new effluent treatment system and percolation area to serve the existing toilet and washroom facilities, (3) change of use: change of use of lands to south of existing campsite from agriculture to campsite use
The development consists of and will consist of the following: Retention Permission for: 1) Existing dormer style log cabin operating as tourism accommodation ancillary to adjoining campsite, 2) Existing waste water treatment system, 3) Ancillary site works. Permission for: 1) To close up existing entrance and remove hardcore surfaced driveway serving the dormer style log cabin, 2) To use the existing entrance to the yurts area of the site along with internal gravelled roadway to access the log cabin building, 3) To carry out alterations to the existing log cabin to include the following: a) Remove front entrance lobby and storage area including cutting back of roof area over, b) Removal of balcony area on gable end, c) Cutting back and removal of large roof overhangs and log ends and the construction of an external block and rendered wall around the exterior of the cabin including alterations to window and door opes to the cabin, d) Upgrading of existing waste water treatment system and percolation area serving the existing log cabin and glamping yurts/camping area, e) All ancillary site works to include extensive landscaping to the north west of the site
The brief summarizes the pattern across all 182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record KA200995The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief