Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 216 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Construction of a bungalow type dwelling, formation of new site entrance onto the public road, installation of a proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
EXTENSION OF DURATION OF PLANNING PERMISSION KA201009 - Construction of a bungalow type dwelling, formation of new site entrance onto the public road, installation of a proprietary wastewater treatment unit and percolation area and completion of all ancillary site works.
Alterations and refurbishment of the existing two storey farm house to include the demolition of an existing rear return and outbuildings, provision of a two storey rear extension and single storey side extension, conversion of existing out buildings to living accommodation, provision of an effluent treatment system and percolation area, alterations to the existing vehicular entrances to the site and associated site works. Significant further information/revised plans submitted on this plans
Change of use of an existing two storey standalone storage shed into a retail until with ancillary uses comprising: a) ground floor retail area with staff canteen & toilet facility, b) first floor storage & Workshop with toilet facility, c) external parking area d) wastewater treatment unit and all associated site works
Two single storey extensions to an existing detached house comprising of an entrance Hall/Lobby & Dinning Room area and all associated site works including a wastewater treatment unit
For permission to retain and complete development (previously granted under application number KA161083). The development consists of retention of alterations and amendments to house elevations and floor plans, retention of alterations and amendments to domestic store elevations, retention of site layout and also completion of all ancillary site works
The brief summarizes the pattern across all 216 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record KA201009The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief