Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 249 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
The development consists of 2 bed storey and a half dwelling (215.3 sqm), new entrance, private well, septic tank sewage treatment system with percolation area, a landscape proposal which includes the removal of the existing hedgerow and to be replaced with semi-mature indigenous planting and to be planted 4 m back from the road frontage behind a 3m grass verge, this is to accommodate the required 90m sightlines also a site drainage system to drain to soakpits located on site and all ancillary site works
The development consists of permission for a change of house type from that previously granted under planning reference KA 20/1292 to a 2-no. bedroom dormer type dwelling. All other aspects of the proposed development are to remain as previously approved
Retention for (1) amendments and alterations to elevations and floor plans of existing two storey type house (2) amendments and alterations to elevations and floor plans of existing domestic garage (3) revised site boundary and site layout plan, all previously granted under reference no KA801671 and permission is sought to retain pump house/domestic storage and to complete all ancillary site works.
Renovating a 2 bedroom farmhouse to a 4 bed one and a half storey extension (71.9sqm) & sun room (14.7sqm), to demolish existing shed (18.7sqm) to the front, also to decommission existing septic tank and upgrade to a BAF sewerage treatment system and the use of existing entrance and all ancillary site works. Significant further information/revised plans submitted on this application
The development will consist of the construction of a single-storey extension to the side and rear, South and West side of the existing dwelling. The development will also consist of amendments to the existing fenestration and all ancillary site works
A two storey dwelling with detached domestic garage, a domestic effluent treatment system, new site entrance and all associated site works
The brief summarizes the pattern across all 249 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record KA201292The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief