Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 379 decisions within 5 km, 2 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
The development will consist of revised house plans and revised site layout to previously approved Planning Permission Ref. No. KA/200270 for construction of a bungalow style dwelling with detached domestic garage, install a Proprietary Sewage Treatment System and form new entrance from public road
The following: (1) to retain a one and a half storied detached domestic garage with attached single storied pump and services stores and covered fuel area. The detached garage area consists of car, lawnmower and tool area with toilet and stairs at ground floor level and music room, study and yoga and at first floor level. (2) to retain the construction of entrance gates, wing walls and piers to the entrance previously granted under planning Ref. KA/70029 (3) and all ancillary site development works
Constructing a side sun room extension (40sqm) to an existing bungalow, also converting the attic space containing a bedroom and tv room and with all associated site works. Significant further information/revised plans submitted on this application
The development will consist of; the conversion of existing attic space to contain a family flat (43.2 m2); the provision of two dormer structures to rear roof; the provision of two roof lights to front roof and all associated site works. Significant further information/revised plans submitted on this application
The following development: Retention permission sought for the existing foundations and rising walls on site, and retention of the site entrance, all as included in planning application granted under PI Reg. Ref. No KA70620, planning permission for the reduction in the height of the rising walls, the completion of a single storey dwelling with waste water treatment system, well, recessed entrance and all associated site works. Significant further information/revised plans submitted on this application
EXTENSION OF DURATION OF PLANNING PERMISSION KA70620 - Detached Bungalow
The brief summarizes the pattern across all 379 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record KA201659The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief