Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 221 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention permission for dormer style extension to rear of existing dwelling, comprising of connecting hallway and kitchen extension and bedrooom ensuite at first floor level together with all associated site works
To retain single storey extensions to the front and rear of existing single storey detached dwelling, single storey sheds to rear and associated site works. Significant further information/revised plans submitted on this application
Construct a single storey dwelling house, detached domestic garage, install waste water treatment system and percolation area, form new entrance from public road, together with all associated site works. Significant further information/revised plans submitted on this application
New 3 bay slatted shed and all works ancillary to the overall development on site
To construct a single storey detached dwelling, new vehicular entrance onto private laneway, waste water treatment system and percolation area, landscaping boundaries and associated site works
A 10-year permission for the construction of a Solar PV Energy Development comprising installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries; underground cabling and ducting (including cable link to main College Proteins plant); 1 No. customer control building, 2 No. switchgear and transformer buildings, site perimeter (stock proof) security fence, CCTV security cameras; site access tracks; and all associated site development works. A temporary construction compound will be provided and vehicular access is via existing main access serving College Proteins. The application site includes a proposed cable route and vehicular access through the College Proteins facility that relates to development which comprises or is for the purposes of an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence)
The brief summarizes the pattern across all 221 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA202025The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief