Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 373 decisions within 5 km, 1 exact-site or onsite candidate record, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of the demolition of an existing storage building, the construction of a two storey extension to the side of the existing hardware retail building and all ancillary site development works
For Change of use of the Goods Storage Sheds at to café/restaurant with outdoor seating area, signage and all ancillary works. Kingscourt Railway Station Building is a protected structure (RPS no. CV0144)
To construct a new Fuel Storage Building, to retain an existing Training Building, connection to all existing services and all associated siteworks
Change of use of existing Railway Station buildings to educational purposes on a 5 year temporary basis and all associated site works, these buildings are within the curtilage of a Protected Structure. Significant further information and revised plans have been submitted.
For the construction of a two storey office extension to front of existing manufacturing building, alterations to front, side and rear of existing building, internal alteration, change of use from manufacturing to offices, PV Solar roof panels, signage, new car park area, boundary treatments, landscaping, connection to all existing services and associated site works
To (a) retain 4 no. existing precast concrete production unit (b) block up existing car park entrance and form new main entrance from public road, new internal service road, enlarged car park & truck parking area, extend existing hard standing yard area, install new sewage treatment unit and percolation area together with all associated site works- SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
The brief summarizes the pattern across all 373 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA202032The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief