Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 311 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of the Construction of a Single Storey dwelling, Domestic Garage, Proprietary Wastewater Treatment System and Polishing Filter, Domestic Entrance, including all Associated site works
A proposed storey and a half style dwellinghouse, waste water treatment system and percolation area, connection to existing mains water supply, shared entrance onto public roadway and all ancillaries
REF KA201846 - Proposed storey and a half style dwellinghouse, waste water system and percolation area, connection to mains water and shared entrance onto public road
File Ref: KA201847 - Bungalow, water treatment system & percolcation area
A proposed bungalow, waste water treatment system and percolation area, connection to existing mains water supply, shared enrtrance onto public roadway and all ancillaries
(1) the construction of a new storey and a half 3 bedroom side extension (to the new single storey flat roof side extension) with dormer windows within the front and rear roof slope (2) the construction of a new single storey flat roof side extension to form a link between the existing dwelling and the new storey and a half 3 bedroom extension (3) the construction of a new single storey flat roof canopy to form a covered external area to the rear of the new storey and a half 3 bedroom extension (4) decommission existing septic tank and install a new wastewater treatment system and soil polishing filter, and (5) all necessary ancillary site development works to facilitate this development. To include: demolition of part of the existing shed/garage building, and internal alterations and other works to the existing dwelling to facilitate the proposed extension
The brief summarizes the pattern across all 311 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record KA202041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief