Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 312 decisions within 5 km, 3 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Construction of a storey & a half style dwelling with detached domestic garage, installation of a packaged wastewater treatment system and polishing filter. Proposed entrance onto main road, including all ancillary site works
Construction of a storey & a half style dwelling with detached domestic garage, installation of a packaged wastewater treatment system and polishing filter. Proposed entrance onto main road, including all ancillary site works
Retention of conversion of detached domestic garage to family flat as constructed, together with permission for front porch & two single storey extensions to sides of existing dwelling, one comprising new living area, one forming link between dwelling and converted family flat (with revised layout proposed), alterations to existing and all associated works
The construction of a single storey dwelling, domestic garage, packaged wastewater treatment system with polishing filter, new entrance and all ancillary siteworks
The development will consist of: (a) Retention of baled silage storage shed (b) Retention of Silage Pit (c) Retention of calf house (d) Retention of part of existing cubicle shed (e) Retention of cubicle shed & straw bedded shed (f) Permission for construction of extension to cubicle & straw bedded shed (g) Permission for constrcution of calf rearing shed & underground effluent tank and all associated site works
A) Retention of Grain and Straw Storage Building. B) Retention of Slatted House and Storage Building. C) Retention of Milking facilities, Cubicle and straw bedding Buildings. D) Retention of Slurry Tower. E) Construction of extension to existing assembly yard and associated underground slatted tank. F) Construction of roofed cubicle shed with associated underground slurry tanks and all associated site works
The brief summarizes the pattern across all 312 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record LB180784The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief