Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,256 decisions within 5 km, 2 exact-site or onsite candidate records, and 116 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
116 structured nearby appeal records.
116 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of existing single storey extension to rear and side of existing two-storey dwelling and proposed first floor extension to side of existing two-storey dwelling
2 storey extension to side of existing dwelling, new pedestrian entrance to site side boundary and all associated site works
The development will consist of an upper floor side extension, side roof window, internal alternations to include the provision of a utility room and to all associated site works
1. Partly demolishing of existing side extension, 2. Construction of single storey extension to side to include all associated site works
The construction of a new single-storey extension to the side and rear of existing dwelling, together with all associated site works
Permission for the construction of a part single-storey, part two-storey sports facility including a General Purpose Sports Hall, a boxing arena, a fitness suite, social areas, changing rooms, circulation areas, administration areas, stores, service areas and other ancillary accommodation *Significant Further Information Received on 11/12/2024*
The brief summarizes the pattern across all 1,256 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB180873The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief