Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 301 decisions within 5 km, 1 exact-site or onsite candidate record, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of an extension to existing cubicle shed, to construct a new silage pit and slurry tower with all ancillary site works
File REF: LB200659 - to construct proposed private residence, install new entrance onto main road, install wastewater treatment system and percolation area, including all ancillary site works. Significant further information/revised plans submitted on this application
To construct proposed private residence, install new entrance onto main road, install wastewater treatment system and percolation area, including all ancillary site works. Significant further information/revised plans submitted on this application
The construction of a two-storey dwelling, domestic garage, new entrance, packaged wastewater treatment system with polishing filter and all ancillary site works
To construct proposed private residence, install new entrance onto main road, install wastewater treatment system and percolation area, including all ancillary site works
The development consists of the following:- Retention of site boundary and location of as constructed house. Retention of attic conversion as storage space including roof lights, raised ridge height including retention of window to front porch and gable roof over porch. Retention of detached boiler house. Retention of detached domestic garage and stables. Retention of front boundary wall and all associated site works
The brief summarizes the pattern across all 301 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB180931The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.